01923 85 2722 01923 85 8485

GLP20+ RDE Black (10 Pack)

£5.40 (£4.50 excl VAT)

  • Collar Diameter: 27mm
  • Key Width: 24mm
  • Total Length: 36mm-45mm
  • Operating Temperature: -40 to 100 Degrees
  • Material: Polyamide
  • IP Rating: IP68

Description

Overview:

  • Supplied complete with locknut and reduction sealing insert
  • Halogen free
  • Vibration proof
  • M20 Thread
  • 5 bar
  • Suitable for cable with a minimum size of 4mm and a maximum of 16mm
  • Flame protection: glow wire test 750°C accurate to BS EN 60695-2-11
  • Temperature range: -40°C to 100°C, interm up to approximately 120°C
  • Resistance to acetone, benzine, benzene, diesel oil, oils and greases, paint and varnish solvents

Specification:

  • Material cable gland: Polyamide
  • Material sealing gasket: EPDM
  • Protection class: IP69, IP68 (5 bar 30 min)
  • Temp. range min: -40 °C
  • Temp. range max: 100 °C
  • Glow wire test: 750 °C
  • Thread type: M
  • Ø Connection thread D: 20
  • Lead: 1,5
  • Length screw-in thread L: 10 mm
  • Ø cable diameter min: 4 mm
  • Ø cable diameter max: 14 mm
  • Key width SW: 24 mm
  • Collar diameter (E): 27 mm
  • Total length TL: 36 mm – 45 mm
  • Type of cable anchorage: A
  • Install. torques fitting: 4 N m
  • Install. torques fitting/EADR: 3 N m
  • Install. torques cap nut: 3 N m
  • Product Color: RAL 9005
  • Type: GLP20+ RDE black
  • Order no. RAL 9005 10100636
  • Packing unit: 10

View the datasheet for any additional information you may require.

Click here to view our selection of weatherproof enclosures applicable to the GLP20+ RDE.

Click here for our full range of Wiska accessories.

Additional information

Weight 0.14 kg

Reviews

There are no reviews yet.

Be the first to review “GLP20+ RDE Black (10 Pack)”

You may also like…

We are now closed for our Christmas holiday

Any orders placed will be processed when we re-open on the 5th of January 2026

00
Months
00
Days
00
Hours
00
Minutes
00
Seconds
Close the CTA

We are now closed for our Summer holiday

Any orders placed will be processed when we re-open on the 25th of August 2025

00
Months
00
Days
00
Hours
00
Minutes
00
Seconds
Close the CTA